Key Systems

fancy

Advanced Work Packaging

Enables users to analyse the performance of work packages from design through to construction.

Read More
fancy

Progress Measurement System

Assured real-time project performance information, predicted future performance insights and alerts.

Read More
fancy

Material Management System

Track every piece of material from design to final installation.

Read More
fancy

Project Estimating System

Automatically convert engineering design outputs into cost and construction man-hours.

Read More
fancy

Supply Market Analysis

Monitor all of your suppliers performance on a project and across a portfolio of projects.

Read More

Contact Us!

Our trusted customers and partners

The Transformation Imperative

The evidence is clear. Capital project execution is inefficient.

60%

of capital projects face

cost over runs

70%

of capital projects have

schedule delays

60%

Completion costs

are on average 60% higher than planned
When a capital project gets complicated and it starts running behind, everybody looks for someone to blame. The truth is, the weaknesses are systemic, and finger pointing only causes more productivity loss.
section 1
“Hidden” changes to engineering design, material delivery dates and expected construction man hours are all examples that disturb the certainty of project cost, schedule and quality.
section 2
“Hidden” changes to engineering design, material delivery dates and expected construction man hours are all examples that disturb the certainty of project cost, schedule and quality.
Now it’s time to go from being reactive to proactive. Going beyond “what’s wrong” and digging into “why is it happening” and “What can I do about it” is an achievable first step into transforming the industry.
section 3

How CPEC works

CPEC delivers near real-time granular project and portfolio insights via a 3D digital twin, dashboards and reports. It does this by connecting and analysing multiple disparate data sources from EPCs, Contractors, Owners and 3D images taken regularly on-site. For project managers, CPEC allows project managers to act on these insights and assess options to change future delay and cost over run outcomes.
image 1